Users of this system, can login to view this document.
Login
Enter the following information to request a copy of the document from the responsible person.
Optimasi Penjadwalan Proyek menggunakan Eraned Value Method (EVM) dan Critical Path Method (CPM) (Studi Kasus : Preservasi Jalan Gusiq – Sp. Blusuh, Kabupaten Kutai Barat, Kalimantan Timur)
This email address is used for sending the document.